Chargement…
Chargement…
by Dakhla Aménagement Team

Cement has no expiry date in the strict sense, but it gradually loses activity over time. The practical rule accepted on sites: about three months of optimal conservation in bags, in good conditions. Beyond that, cement is not suddenly "off" — it simply needs testing and reserving for less demanding uses. Understanding the mechanism avoids both throwing away useful bags and casting a weakened binder into a structure.
Cement setting relies on clinker compounds ready to react with water. Yet ambient moisture alone is enough to trigger that reaction imperceptibly: every bag absorbs and releases water vapour with atmospheric swings, and a fraction of the grains hydrates prematurely. Grinding fineness — high for a CPJ, it is what makes it reactive — accelerates the process: the larger the exposed surface, the faster the ageing. The consequence is measurable: slower sets, lower final strength.
Three signs don't lie. First, lumps: fresh cement flows like a fine powder; aged cement clumps. Second, the hardness of the lumps: crumbly under your fingers signals mere packing; stone-hard signals advanced hydration. Third, behaviour at mixing: a slow set or an odd consistency at constant water should raise a flag. When in doubt, cast a small control specimen: if it hardens normally within days, the batch keeps most of its activity.
Cement checked after three months is not for the skip. Use it first for non-structural work: blinding concrete, patching mortars, make-up pieces, secondary slabs — and keep the freshest bags for reinforced concrete and designed structures. Mark the packing date in chalk on every pallet at delivery: that simple habit turns stock management into routine.
The key point to remember: the packing date printed on the bag is what counts, not the purchase date. A bag bought yesterday but out of the plant for six months is "older" than one bought two months ago and delivered fresh.
Locate the packing date printed on the bag (or the bulk delivery note): it — not the purchase date — starts the clock.
Dry, ventilated room, bags raised on pallets: under these conditions, allow about 3 months of optimal conservation.
Hard bags, lumps your finger cannot crush, mass setting: this cement has lost part of its activity.
After long storage, a simple control specimen cast before resuming work checks setting and cohesion.
Organise stock so the oldest batches are consumed first and limit dormant inventory.

Same chemical basics, different raw materials, a price 2 to 3 times higher: what white cement truly brings, what it costs, and why DAM stays out of it.
Read article
Cement is a powder binder; concrete is the composite that results with aggregates and water. Composition, uses and the practical consequences for your site.
Read article
Two binders, two chemistries: cement for structures, lime for masonry that must breathe. The guide to choosing without damaging existing fabric.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.