by Dakhla Aménagement Team

Sustainable construction rests on an often-unstated truth: the greenest building is the one you never rebuild. Before talking about green materials, the first lever is to build right — correct dosing, careful execution, long service life. Cement does have a genuine carbon question that our industry has never hidden: understanding the mechanisms lets you pick the real levers instead of slogans.
Emitting CO2 is part of the very chemistry of the material: to make clinker — the raw material of every cement — limestone is heated to about 1,450 °C, and the stone decomposes into lime while chemically releasing CO2. This “decarbonation” accounts for roughly 60% of a plant's emissions; the remaining 40% come from the energy needed to reach those temperatures. That is why the industry works the issue on two fronts: substituting part of the clinker with mineral additions, and decarbonising kiln energy. Our page on the carbon footprint of cement details these mechanisms.
The EN 197-1 / NM 10.1.004 standard defines common cements as blends of clinker and additions: CEM I is nearly all clinker, while CEM II — the family of the Moroccan CPJ — incorporates 6 to 35% additions: limestone, slag, pozzolan or fly ash depending on the composition. Less clinker mechanically means less CO2 per tonne, at equal certified quality. The CPJ 45 and CPJ 55 we grind at Lassargua are CEM II: a technical and environmental choice at once, with no change whatsoever to the mason's craft.
A project's footprint also lives — heavily — in its quantities: a dosage matched to the real use (300 kg/m3 for plain unreinforced concrete, 350 for standard reinforced), a controlled water/cement ratio, volumes calculated rather than guessed, and careful execution that avoids re-work in ten years. One cubic metre of well-executed concrete in Dakhla's marine air is worth two poorly executed ones: durability is the first carbon saving. Our concrete durability guide details these settings (W/C, cover, 7-day curing).
Demolished concrete can be crushed into recycled aggregate: foundation sub-bases, backfill, platform capping layers, and — subject to testing — aggregate for low-demand new concrete. It is a stream taking shape in Morocco, driven by urban demolition projects. The technical honesty point: cement itself is not “recycled” into cement — once hydrated, it is concrete; what gets recycled is concrete as aggregate. The useful site gestures: sort demolition flows, separate clean concrete from soils and timber, and accept recycled material where the standard allows it.
A building's “operational” carbon (heating, cooling, lighting over decades) weighs heavily against the “embodied” carbon of materials. A well-thought envelope — wall inertia, solar shading, orientation, natural ventilation — changes the energy bill far more than the choice between two cements. In Dakhla, where the thermal swing stays moderate but the sun hits hard, well-placed concrete inertia contributes to comfort without permanent air conditioning: durable concrete in a designed building is the pairing that lasts.
Our concrete levers: producing CEM II addition cements (less clinker per tonne), grinding locally at Lassargua (500,000 t/year capacity) to deliver Dakhla and its region — proximity means short transport and avoided emissions —, and maintaining lot-level traceability that documents what was poured. Our quality approach follows ISO 9001 (in progress, never claimed as obtained), and our environmental commitment is an improvement process stated as such. What we will not do: sell you a “carbon neutrality” that no cement plant on Earth has achieved today.
Cutting the carbon footprint of cement in a project comes down to four ranked gestures: build right (dosage and execution), choose a certified addition cement (CPJ/CEM II), work with a nearby producer (short transport), and make it last (curing, cover, maintenance). The rest — labels, slogans, offsets — should be judged against these fundamentals. Our role is to supply the documented, consistent binder these choices rely on.
Dosages matched to real use (300 kg/m3 plain, 350 reinforced) and calculated volumes: the first carbon waste is concrete poured for nothing.
CPJ = CEM II (6-35% additions, limestone among them): less clinker per tonne at equal certified quality.
A nearby producer (local grinding, 24-hour delivery) avoids tens of kilometres per tonne — real, not symbolic, savings.
Low W/C, cover, curing: concrete that lasts 50 years is never rebuilt — longevity remains the best circular economy.
Sort rubble, separate clean concrete, use recycled aggregate where the site allows it.

Deep-water port, road opening-up, public facilities: what Dakhla's transformation demands from a cement supply — consistency, volumes, logistics — and how we answer from Lassargua.
Read article
Pallets, dry storage, stock rotation: the simple rules that preserve cement activity — and the tell-tale signs of a degraded binder to turn away.
Read article
Detailed comparison table of the two Dakhla Aménagement cements. When to use CPJ 45 and when to prefer CPJ 55 for your project.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.