CO₂ capture is the cement industry's next frontier. Direct answer: no cement plant in the world captures its CO₂ at scale today; the routes under study — post-combustion, oxy-fuel, calcium looping, mineralisation — are at pilot and demonstrator stages. It is a sector subject, not a purchasing option.
Cement's peculiarity lies in its chemistry: roughly two thirds of the emissions of a tonne of clinker come from limestone decarbonation (CaCO₃ → CaO + CO₂, a reaction mandatory to produce the binder), the rest coming mainly from the kiln's heat (~1,450 °C). Decarbonising energy is therefore not enough: even a kiln fired on green energy would emit the limestone's CO₂. Hence the interest — and the difficulty — of capture.
| Route | Principle | Maturity |
|---|---|---|
| Post-combustion (amines) | Capture CO₂ from flue gases via solvents | Industrial pilots |
| Oxy-fuel combustion | Burn in pure oxygen: CO₂-concentrated fumes | Pilots |
| Calcium looping | Limestone acts as a regenerative CO₂ sorbent | Demonstrators |
| Mineralisation / utilisation (CCU) | Fix CO₂ into carbonates, including concrete curing | R&D, early commercial |
The first is energy: pulling CO₂ out of flue gas costs energy, which must itself be decarbonised for the balance to hold. The second is scale: a modern plant emits thousands of tonnes of CO₂ per day — compression, transport and storage chains are national infrastructures. The third is economic: without a structured carbon price or valued outlets, the extra cost does not fit in the bag's price.
No 'captured' cement is commercially available; 'CO₂-injected' concretes remain niches. Today's concrete levers lie elsewhere: reduced-clinker formulations (CEM II with additions, our CPJ range among them), service life of structures (a concrete that lasts fifty years amortises its footprint), and local sourcing that shortens transport.
We follow these developments as a producer — the subject deserves honest telling rather than slogan summary. For your current sites: CPJ 45 and CPJ 55 compliant with NM 10.1.004 / EN 197-1, quote within 24 h.
Post-combustion, oxy-fuel, calcium looping, mineralisation: four principles, different maturities — none industrial today.
Published international demonstrators are the evidence: watch scale announcements, not intention statements.
No 'captured' cement is commercially available: any contrary claim in an offer is a warning signal.
Today's concrete lever: reduced-clinker CEM II (our CPJ range among them), right class without over-specifying.
Producing near consumption cuts the transport item — an immediate, verifiable carbon lever, no waiting technology.

Wood, agricultural residues, RDF: substituting fossil fuel in the clinker kiln. The kiln's assets, the fuels' watch-points — and why nothing changes in the bag.
Read article
Co-processing valorises waste in the ~1,450 °C kiln with no final residue — under a strict environmental permit. What the kiln accepts, refuses, and its place in the waste hierarchy.
Read article
PV powers a cement plant's auxiliaries today; solar heat awaits its demonstrators. Sector orders of magnitude and Morocco's solar context, with no invented figures.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.