/02

Our Manufacturing Process

From raw material to finished product, discover each step of our clinker grinding process

ÉTAPE 01

Clinker Reception

Clinker is received and stored at our Lassargua facility. We ensure rigorous quality control at every delivery, verifying the chemical composition and physical properties of the raw material.

Clinker Reception
ÉTAPE 02

Fine Grinding

Clinker is finely ground in our high-performance ball mills. The grinding process guarantees optimal fineness to ensure the mechanical characteristics of the finished cement.

Fine Grinding
ÉTAPE 03

Dosing & Additions

Precise dosing of additives (gypsum, limestone, fly ash) guarantees the specific characteristics of each cement type. Each formulation is rigorously controlled by our laboratory.

Dosing & Additions
ÉTAPE 04

Packaging & Shipping

Cement is packaged in 50 kg bags, big bags or shipped in bulk. Our optimized logistics ensure fast and reliable delivery across Southern Morocco and beyond.

Packaging & Shipping

Questions about our process?

Contact our technical team