Our Manufacturing Process
From raw material to finished product, discover each step of our clinker grinding process
Clinker Reception
Clinker is received and stored at our Lassargua facility. We ensure rigorous quality control at every delivery, verifying the chemical composition and physical properties of the raw material.

Fine Grinding
Clinker is finely ground in our high-performance ball mills. The grinding process guarantees optimal fineness to ensure the mechanical characteristics of the finished cement.

Dosing & Additions
Precise dosing of additives (gypsum, limestone, fly ash) guarantees the specific characteristics of each cement type. Each formulation is rigorously controlled by our laboratory.

Packaging & Shipping
Cement is packaged in 50 kg bags, big bags or shipped in bulk. Our optimized logistics ensure fast and reliable delivery across Southern Morocco and beyond.

Questions about our process?
Contact our technical team →