1T Big Bag Cement — Easy Handling

1-Ton Big Bag Cement in Morocco

CPJ 45 and CPJ 55 cement in 1T Big Bags, handled by crane or forklift. Ideal for medium sites without silo. From 1,580 DH/T. Delivery across Southern Morocco and Mauritania.

1T Big bag

1 ton of cement per big bag — reinforced polypropylene

Lifting straps

4 loops for crane or forklift — 1,500 kg load

Local production

Packaging on site at the Dakhla grinding plant

Guaranteed quality

NM 10.1.004 / EN 197-1 compliant — lab control

Advantages of 1T big bag cement

The 1T big bag is the ideal compromise between bulk and 50kg bags for medium sites.

No silo required

The big bag replaces the mobile silo. Ideal for medium sites without fixed storage infrastructure.

Crane/forklift handling

4 integrated lifting straps for crane, forklift or telehandler. 1 big bag = 1 single lift (vs 20 bags).

Moisture protection

Sealed polypropylene container with inner lining. Protects the cement from moisture and climate variations.

Ideal medium volume

1T per big bag — perfect for 5-30T sites. Optimal compromise between bulk (too voluminous) and bags (too fragmented).

1T big bag specifications

Technical specifications of the 1T cement big bag (dimensions, straps, capacities).

SpecificationValue
Capacity1,000 kg (1 ton) of CPJ 45 or CPJ 55 cement
MaterialReinforced woven polypropylene, UV-resistant, with inner PE lining
Outer dimensions90 × 90 × 110 cm (L × W × H) — fits standard pallet
Lifting straps4 crossed loops of 25-30 cm (safe load 1,500 kg)
Filling openingTop spout Ø 40 cm, height 30 cm
Discharge spoutBottom spout Ø 35 cm with closure tie
StabilityAnti-slip base, stable cubic shape on the ground
ReusabilityBig bag not reused for cement (safety standard)
Site storageOn flat ground, protected from rain and direct sun — max. 3 months
Ex-works Dakhla priceCPJ 45 from 1,580 DH/T — CPJ 55 from 1,680 DH/T

Comparison: Bulk vs 50kg bags vs 1T Big Bag

Which packaging to choose for your site? Complete comparison table.

CriterionBulk50kg bags1T Big Bag
CPJ 45 price (from)1,500 DH/T1,550 DH/T1,580 DH/T
CPJ 55 price (from)1,600 DH/T1,650 DH/T1,680 DH/T
Minimum volume30T1 bag1 big bag (1T)
Required equipmentStorage siloNone (2-person handling)Crane / forklift
Handling speedFast (auto pumping 30-45 min/30T)Slow (20 bags to handle for 1T)Very fast (1 single lift for 1T)
Ideal forLarge sites (>30T)Small sites (<5T), individualsMedium sites (5-30T)
StorageFixed silo1T pallet, dry roomFlat ground, rain shelter
Packaging wasteNonePaper bags + pallet film1 PP big bag per ton

* Ex-works Dakhla prices. Delivery calculated by zone. The 1T big bag is highlighted as the optimal compromise for medium sites (5-30T) with lifting equipment.

1T big bag cement: the medium-site solution

The 1T big bag (FIBC — Flexible Intermediate Bulk Container) is a flexible container made of reinforced woven polypropylene that contains 1 ton of bulk cement. It is equipped with 4 integrated lifting straps allowing easy handling by crane, forklift or telehandler. It is the packaging of choice for medium sites (5 to 30 tons) that do not justify installing a silo but want to avoid the tedious handling of 50kg bags.

Dakhla Aménagement offers CPJ 45 (1,580 DH/T) and CPJ 55 (1,680 DH/T) in 1T big bags, compliant with NM 10.1.004 and EN 197-1 standards. Packaging is done at our Dakhla grinding plant, ensuring cement freshness and batch traceability. Big bags are delivered across Southern Morocco (Dakhla, Laayoune, Boujdour, Tan-Tan, Guelmim) and Mauritania, on pallet or bulk on flatbed truck.

Why choose the 1T big bag?

  • 20x faster handling than 50kg bags (1 single lift for 1T)
  • No silo infrastructure required — ideal for temporary or itinerant sites
  • Optimal moisture protection (sealed inner PE lining)
  • Stable on the ground once placed — no risk of tipping like bags
  • Easy discharge through bottom spout (35 cm diameter) without excessive dust
  • Economic compromise: only 2% more expensive than bags, 5% more than bulk
  • Adapted to all common lifting equipment (crane, forklift, telehandler, sling beam)

Big bag storage on site

Big bags are stored on flat and stable ground, ideally on a concrete slab or raft. Make sure to protect them from rain (tarpaulin) and direct sun (fabric UV-resistant but long-term degradation). Do not stack full big bags (unless specific authorized models). Storage life: maximum 3 months in original unopened packaging. Once opened, empty the big bag within 7 days to prevent partial setting of the remaining cement.

1T cement big bag price in Morocco

The 1T big bag price starts at 1,580 DH/T for CPJ 45 (i.e. 1,580 DH per big bag) and 1,680 DH/T for CPJ 55 (i.e. 1,680 DH per big bag). The premium of 30 DH/T over 50kg bags reflects the cost of the big bag packaging (reinforced polypropylene + straps + PE lining). For orders of multiple big bags, volume discounts apply. Request a free quote for precise pricing including delivery to your site.

Frequently asked questions about 1T big bag

What is a cement big bag?

A big bag (FIBC — Flexible Intermediate Bulk Container) is a flexible container made of woven polypropylene fabric, reinforced, designed to transport and store 1 ton of bulk cement. It is equipped with lifting straps (4 loops) for crane or forklift handling, a top filling opening (40 cm diameter) and a bottom discharge spout. The big bag protects the cement from moisture and enables industrial handling without a fixed silo.

What equipment is needed to handle a 1T big bag of cement?

Handling a 1T big bag requires lifting equipment: crane, forklift (telescopic mast), telehandler or sling beam. The integrated lifting straps (4 loops of 25-30 cm) are designed to be easily grabbed by forks. Once placed on the ground, the big bag is stable and can be emptied through the bottom spout. For sites without lifting equipment, prefer 50kg bags.

How many big bags for X m³ of concrete?

A 1T big bag contains 1,000 kg of cement. For standard reinforced concrete dosed at 350 kg/m³, one big bag produces about 2.85 m³ of concrete (1000 ÷ 350). For concrete dosed at 300 kg/m³, count 3.33 m³ per big bag. For concrete dosed at 400 kg/m³, plan 2.5 m³ per big bag. The 1T big bag is therefore ideal for 2 to 4 m³ batches — typical of medium sites.

Big bag or 50kg bags: which to choose?

The 1T big bag (1,580 DH/T) is more expensive than 50kg bags (1,550 DH/T) by about 2%, but offers 20x faster handling (1 big bag = 20 bags in a single lift). The big bag is ideal for medium sites (5-30T) with lifting equipment. For small sites (<5T) without a crane, 50kg bags remain more practical. For large sites (>30T) with silo, bulk (1,500 DH/T) is the most economical.

What is the price of a 1T cement big bag in Morocco?

The price of a 1T cement big bag (CPJ 45) starts at 1,580 DH/T, i.e. about 1,580 DH per big bag. For CPJ 55, count from 1,680 DH/T, i.e. about 1,680 DH per big bag. The premium over 50kg bags (30 DH/T) reflects the cost of the reusable big bag packaging. Volume discounts for orders of multiple big bags.

Need 1T big bag cement in Morocco?

Free quote within 24h. CPJ 45 from 1,580 DH/T, CPJ 55 from 1,680 DH/T (1T big bag). Delivery across Southern Morocco and Mauritania.