by Dakhla Aménagement Team

Dakhla is going through a visible transformation: nation-scale construction sites sit alongside the rapid growth of a city that keeps adding districts and facilities. Behind every phase — earthworks, abutments, buildings — lies a less spectacular reality: thousands of tonnes of cement, delivered on schedule, in consistent and traceable lots. This page explains what such projects demand from a supplier, and how we answer.
The most structuring project is public and documented: the deep-water port north of the city, a state-led development giving the region a major port facility. Around it, the momentum is broad: public facility programmes (health, education, sport), road upgrades linking the city to the rest of the Kingdom, growth of the economic fabric — cold chain, fishing, logistics — and the residential growth that follows. We do not quote figures for work we have not delivered ourselves: what is certain is that the visible pace of construction exceeds previous decades, and that none of these structures happens without concrete.
An infrastructure site does not consume cement like a house: it consumes it in hundreds of tonnes, in a continuous flow, with three non-negotiable requirements. Consistency first — a lot that varies between trucks makes cube strengths drift and forces the site laboratory to recalibrate its mixes. Traceability next — project engineers and control offices require the per-lot test certificate, conforming to NM 10.1.004 / EN 197-1, to document every pour. Logistics finally — cement that arrives late stops a formwork crew, and the delay is paid in idle site time. On the coast a fourth, silent requirement adds itself: durability against airborne chlorides, which demands dense concrete and careful cover (our coastal construction guide details these settings).
Our Lassargua grinding plant (500,000 t/year capacity) supplies Dakhla and its region: more than 100,000 tonnes sold per year to more than 120 clients — contractors, material traders, private builders — with fast delivery in Dakhla city and across the region. This proximity changes the game for a site: no long haul from northern plants, no gap in a tight schedule, and a supplier who knows local conditions. We deliver in bulk (flow sites), 50 kg bags and one-tonne big bags depending on site layout.
| Typical use | Class | What drives the choice |
|---|---|---|
| Standard concrete, earthworks, slabs | CPJ 45 | Consistency, easy placement |
| Dense reinforced concrete, prestressed elements, exposed parts | CPJ 55 | Early strength, low-W/C mixes |
| Specific needs (special set, severe exposure) | Per specification | The site lab specifies, we document |
In all cases the per-lot certificate travels with the delivery — it is what lets the concrete plant and the control office sleep at night. Our reference prices: set in a personalized quote according to volumes and packaging.
The flow is simple and proven: a quote stating volumes, packaging, pace and delivery zone; validation of the cement class with your laboratory if the mix design requires it; then the delivery plan aligned with pouring phases. For continuous-flow sites, bulk with an on-site silo is the most efficient formula; for spread or landlocked sites, big bags secure the restarts. Our civil-engineering page gathers what such projects usually ask of us.
Dakhla's transformation is built with concrete, and concrete is built with consistent, documented, on-time cement. That has been our trade since our installation at Lassargua: grind locally, certify every lot, deliver on time — and say so, without ever claiming references we have not documented. Projects that want to judge on the record only need to ask for a quote: the facts are there.
Pouring phases, weekly tonnages, identified peaks: supply is planned like formwork.
Bulk + silo for continuous flows, 50 kg bags for restarts, one-tonne big bags for spread or landlocked sites.
CPJ 45 for standard concrete, CPJ 55 for dense or exposed parts — specification settled with the laboratory.
Delivery within 24 hours in Dakhla city, 24-72 hours in the region: late cement costs idle site time.
Every NM 10.1.004 / EN 197-1 lot tied to its pour: documentation is part of the delivered works.

Pallets, dry storage, stock rotation: the simple rules that preserve cement activity — and the tell-tale signs of a degraded binder to turn away.
Read article
Detailed comparison table of the two Dakhla Aménagement cements. When to use CPJ 45 and when to prefer CPJ 55 for your project.
Read article
Practical formulas and worked examples to estimate your cement needs: foundations, slabs, walls, plastering. Correspondence tables.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.