Direct answer: a slab on grade is poured at 300 kg of cement per m³ for standard use — 350 kg/m³ for a reinforced floor slab — at 10-15 cm thickness depending on use, with welded mesh on spacers, polythene sheeting, 7-day curing and joints cut every 4-6 m. For 20 m² of 12 cm slab: 2.4 m³ of concrete, about 15 fifty-kg bags — or one ready-mix truck.
The ratio-thickness pair is chosen by the slab's destination. A pedestrian terrace does not work like a driveway, and an industrial floor belongs to engineered design. As standard rules:
| Use | Thickness | Mix ratio | Reinforcement |
|---|---|---|---|
| Terrace and pedestrian slab | 10-12 cm | 300 kg/m³ | ST25 mesh |
| Driveway, garage | 12-15 cm | 350 kg/m³ | ST25/ST35 mesh |
| Industrial floor | 15-20 cm + | 350+, engineered mix | Mesh or fibres |
| House floor slab | 15-20 cm | 350 kg/m³ | Calculated rebar (engineer) |
1. Prepare the base. Excavate to level, 20-30 cm of hardcore compacted in layers, polythene sheet covered and turned up at the edges — without it, rising damp crosses the slab for life. 2. Place the reinforcement right. Welded mesh on spacers, in the bottom third of the thickness; laid flat on the sheeting, it does nothing. 3. Pour. Concrete at 300-350 kg/m³, placed without segregation, vibrated or tamped, floated surface; in hot weather, pour in the morning and protect immediately.
4. Cure for 7 days. Watering, curing film or wet geotextile: the most cost-effective site measure against cracks, dust and capped strength. 5. Cut the joints. A 4-6 m grid, one third of the thickness deep, within 24-48h of pouring: a designed joint always beats an endured crack.
Below 2-3 m³, site-mixed concrete — 6-7 bags per m³ depending on ratio, clean sand and gravel, measured water — remains viable with a mixer and method. Beyond that, or for any slab meant to last: ready-mix concrete delivered by truck guarantees constant ratio, continuous placement and certified strength. DAM serves both worlds: CPJ 45 cement in bags or big bag for mixing sites, and ready-mix concrete for pouring days.
Price your slab in three minutes with our calculator — volumes, bags, ratio — then request a quote: within 24h in Dakhla, the slab only waits for your calendar.
Levelled grade, 20-30 cm compacted hardcore in layers, polythene sheet turned up at the edges.
Welded mesh on spacers, in the bottom third of the slab — never on the ground: the mistake that cancels the steel.
Concrete at 300-350 kg/m3, vibrated or tamped, floated surface: in hot weather, pour in the morning.
Watering, curing film or wet geotextile: the most cost-effective measure against cracks and dust.
4-6 m grid, one third of the thickness, within 24-48 h: a designed joint beats an endured crack.

Plasticisers, superplasticisers, retarders, accelerators, air-entrainers: what concrete admixtures do, how to dose them, and why a trial mix with your own cement is non-negotiable.
Read article
Lightweight, pervious, self-compacting, high-performance, pumped or from the future (geopolymers, 3D printing): what each special concrete changes on your site, and how to pick the cement that carries it.
Read article
Blast-furnace slag, pozzolan, fly ash, limestone: what mineral additions really change — setting, heat, resistance to aggressive water — and how to choose between CEM II, CEM III and CEM IV in Morocco.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.