by Dakhla Aménagement Team

In intense heat, concrete behaves like a material in a hurry: water evaporates faster, setting accelerates and plastic-shrinkage cracks threaten the surface right after casting. Beyond roughly 30 °C for fresh concrete, these effects call for specific precautions — even more so in the arid regions of southern Morocco, where heat, dry wind and direct sun combine. Concreting in hot weather is not forbidden; it is a matter of organisation.
Heat accelerates cement hydration: the concrete gains early strength but loses workability, becomes harder to place and sees its working window shorten. At the same time, surface evaporation — aggravated by wind and direct sun — dries the surface before setting has consolidated it: that is plastic shrinkage, cracking the skin of the concrete in characteristic chevron patterns. And mix water added to compensate dilutes the paste and lowers final strength: restoring workability by adding water is the worst possible answer.
Formulation tools exist and work: set retarders dosed per the concrete mix design, a strictly controlled water/cement ratio (counted to the litre, never by eye), possibly a plasticising admixture to hold workability without adding water. Those adjustments belong to the concrete designer or the ready-mix supplier — not to improvisation on site. The principle stands: heat means steering the set, not enduring it.
In an arid climate, curing is not a finishing option — it is the structural gesture of the pour. As soon as placing ends — immediately, not "after the break" — the surface must be protected from evaporation: regular spraying, polythene film, damp geotextile or a curing compound. That protection is kept up for several days. Well-cured concrete in heat develops its strength without cracks; the same concrete abandoned in the sun cracks on the surface and loses part of its durability, especially against sulphates and salts.
The Dakhla region stacks the demanding factors — heat, wind, salty air — but also a practical reality: a local cement producer shortens the time between plant exit and casting, with delivery included in the city, timelines confirmed in your quote. A fresh binder, short logistics and teams organised around thermal windows: that is the equation for concreting with confidence in the Deep South.
Plan pours early morning or evening to avoid peak heat; fresh concrete above 30°C requires precautions.
Shade the aggregates, keep mixing water cool: every degree gained on constituents delays rapid setting.
In hot weather, a set retarder (per the concrete mix design) and a controlled water/cement ratio preserve workability.
Shorten transport and placing times; vibrate effectively before the concrete starts to set.
Moist protection right after casting (spraying, film, geotextile) kept for several days: curing is the anti-cracking key in arid climates.

Autoclaved blocks or foam poured in place: two products, two workflows, one principle of air voids. Choosing, laying, and the mistakes to avoid.
Read article
Fibers bridge microcracking and complement rebar — they never replace it. Steel, polypropylene, glass and carbon compared; CPJ 45/55 mix design and site checks. DAM supplies the cement, not the fibers.
Read article
60 to 100 MPa and beyond: how an HPC is designed (very low W/C, silica fume, superplasticisers), what it truly brings, and why it has no place on a standard villa.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.