by Dakhla Aménagement Team

Bulk is the supply mode for sites that consume: no packaging to discard, no bags to handle, a lower price per tonne. The short answer: it requires a storage silo on site (30 to 200 T capacities, rental available from partners), is delivered by tanker truck from 30 tonnes — one full load — and the transfer takes 30 to 45 minutes. Below that volume, big bags or 50 kg bags remain the right answer.
The truck arrives on your site, connects to the silo through a flexible hose, and pumps the cement directly into the cell. The operation is automated and controlled by the driver: allow about 30 to 45 minutes to transfer 30 T. Your two duties: have a silo (see below) and a practicable truck-access zone. The 30 T minimum is not a commercial whim: below a full load, bulk logistics become prohibitive and the per-tonne price loses its point.
Site silos range from 30 to 200 T depending on your consumption. Do not own one? Rental from specialised partners is the standard route — our team can point you to them and advise on the right size for your consumption pace. In the field, three reflexes keep your bulk sound: a silo sealed against rain and ambient humidity, a clean discharge valve to avoid blockages, and stock rotation — cement should be consumed within 3 months of production, first in, first out.
Below the 30 T mark, one category keeps the advantages of bulk without the infrastructure: the portable or mobile silo, a 5-30 T vessel mounted on a chassis — towable, or crane-liftable to follow the site from one zone to the next. Discharge is by gravity or screw, straight into the mixer or chute; recent models integrate a sleeve filter, level gauge and sealed outlet valve. For a mid-sized site, a precasting yard or an urban plot where a fixed silo would need heavy permitting, it is the compromise: less packaging than big bags, less handling than 50 kg bags, and equipment that moves on to the next site.
The DAM tanker connects to a portable silo exactly as to a fixed one — flexible hose, blowing, filtration — provided the silo stands on stable ground and its filters are maintained: a clogged filter pressurises the cell and pushes cement everywhere but inside. Plan the refilling logic too: a 10 T silo receiving 10 T leaves no safety reserve; schedule replenishments around your pouring rhythm — 24 h delivery makes the exercise comfortable in the Dakhla region.
| Your profile | Right solution | Benchmark price |
|---|---|---|
| Large site, steady consumption > 30 T | Bulk into silo | Quote by volume |
| Mid-size site, 1 to 30 T | 1 T big bags | On request |
| Small areas, touch-ups | 50 kg bags | On request |
Bulk shines over time: less handling, less packaging, replenishments aligned with the pour schedule. Big bags keep the flexibility advantage on intermediate sites — our big bag vs bags comparison details these trade-offs.
Plan around lead times: schedule deliveries around your pours, not the other way round. In Dakhla City, delivery is included, within 48 h — 24 h express; across the region, per agreed conditions. Every delivered lot is lab-tested before shipping: the certificate of conformity travels with the delivery note — keep it in the site file.
A site that justifies bulk? Describe your volumes and schedule: CPJ 45 or CPJ 55 bulk quote, free within 24 h.
From 30 to 200 T depending on consumption; rental from partners is available.
A practicable passage and parking zone for the tanker truck.
About 30-45 minutes for 30 T: the driver runs the pumping, you watch the silo.
Sealed silo, clean valve, first-in/first-out rotation, use within 3 months.
Minimum 30 T per delivery: align replenishments with your pours.

Boom or stationary pumps, pipelines and equivalent lengths, mixes that travel without segregating: everything to know before having your concrete pumped.
Read article
Shrinkage, thermal or structural cracks: read the timing, pattern and width before repairing. Dosage, W/C and 7-day curing prevent most of them.
Read article
Plastic, autogenous, drying shrinkage: three clocks, one main remedy — 7 days of moist curing. The role of dosage and cement fineness.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.