A swimming pool is first and foremost a reinforced-concrete structure: base slab, walls and copings rest on a designed, cast structure built with a cement of the right class. So "which cement for my pool?" has a two-part answer: a structural cement for the basin itself — and dedicated products, distinct from cement, for waterproofing and finishes. Confusing those two levels is the most common — and most expensive — mistake in pool projects.
Base slab and walls are designed like any buried structure: water load, earth pressure, possible high water table. For a standard in-ground pool, CPJ 45 (45 MPa at 28 days) suits the structural concrete. CPJ 55 earns its place for large basins, heavily stressed structures or salt-exposed sites — coastal locations in particular, consistent with Dakhla's climate. That choice belongs to the design: have it validated by the professional sizing the pool.
| Element | Function | Suitable product |
|---|---|---|
| Base slab and walls | Load-bearing structure | Reinforced concrete CPJ 45 (or CPJ 55 per design) |
| Waterproofing | Hold the water | Dedicated system: membrane, liner, waterproof render |
| Tiled finish | Finishing | Class C2 adhesive (often C2TE S1/S2) + suitable joints |
Concrete, even well dosed and well cured, is not watertight by nature: it is porous and micro-cracked. A basin's watertightness rests on systems built for it — reinforced membranes, liners or elastic waterproofing renders — installed to their manufacturer's specifications, on a mature, clean substrate. No "waterproof cement" replaces those systems on a pool: a hydrophobic admixture in the concrete can reduce the substrate's capillarity, it does not do the waterproofing alone. That distinction matters: promising otherwise is planning leaks.
Structure quality conditions the waterproofing laid on top. Three requirements dominate. Compact casting: careful vibration of walls and slab to eliminate gravel nests — future water paths. Serious curing: moisture kept for several days after casting to limit shrinkage and micro-cracking. Treated construction joints: joints sanded, cleaned and bonded with grout before casting resumes. On a pool, every shortcut of this kind is paid back in leaks that are hard to locate.
For pool tiling, EN 12004 calls for a class C2 adhesive, often a C2TE S1 or S2 (deformable) variant; waterproofing itself falls to a dedicated system beneath the tiling. Joints must suit treated water (chlorine, salt) and thermal cycles. Here again, these are specialised products, distinct from structural cement — and we do not manufacture them.
Before choosing any cement, the soil survey dictates the design: ground nature, water presence, bearing capacity. A slab on expansive clay or a pool in a high water-table zone calls for specific measures (drainage, raised slab, pumping during works). Those decisions belong to the pool designer; our role is limited to supplying a class-compliant binder, tested on every batch, and pointing you to the good casting practices described above.
Soil survey, water presence: the base slab and walls must be designed by a professional for the context.
For the base slab and walls in reinforced concrete, CPJ 45 suits common pools; CPJ 55 for demanding or salt-exposed structures.
Compacted concrete without segregation, extended curing: a pool's watertightness starts with support quality.
Watertightness relies on dedicated systems (waterproof renders, membranes, liners) — not cement alone. Follow the chosen system's specifications.
Pool tiling: adhesive rated for immersion (C2, class E or I per EN 12004) and joints suited to treated water.

No cement seals a structure alone: dosage, W/C ratio, compaction and curing build the first barrier — dedicated systems do the rest.
Read article
About three months in bags under good conditions: why cement ages, how to spot a weakened binder, and what to do with an old but sound batch.
Read article
Same chemical basics, different raw materials, a price 2 to 3 times higher: what white cement truly brings, what it costs, and why DAM stays out of it.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.