Creep is the slow, continuing deformation of concrete that stays under load. Direct answer: under a sustained load, concrete keeps deforming for months, even years — long-term creep can reach 2 to 4 times the initial instantaneous deformation. It is neither a defect nor a disease: it is a property that structural design codes integrate from the outset.
Under sustained stress, water adsorbed in the pores migrates and the cement hydrates rearrange: the member shortens a little more than under the load's immediate effect. Part of this deformation is reversible on unloading (deferred recovery), the rest is permanent. The phenomenon stabilises over time on a logarithmic law: roughly half of the ultimate creep occurs within the first months.
Three effects dominate. Deflections: a slab or beam sags more than announced years later if creep was underestimated. Prestress: tendons lose part of their tension — design codes count it from the start. Stress redistribution: in statically indeterminate structures, creep redistributes internal forces — sometimes in your favour, sometimes not.
On site, you play the winning trio: W/C ≤ 0.50, prescribed dosage (350 kg/m³ in standard reinforced concrete), 7 days of curing. You can also delay the loading age of spanning members when the schedule allows. But the creep coefficient to retain, the camber deadline or the prestress loss belong to the structural engineer's calculation — it is not a matter of intuition, even less of cement commerce.
Creep and shrinkage always add up in a loaded member: total shortening combines the load share and the drying share. This is why curing protects twice — it limits shrinkage AND gives the concrete the early strength that reduces later creep.
For structures designed to last, CPJ 45 and CPJ 55 (45 and 55 MPa at 28 days) provide the base — with 2/7/28-day strength tests and a per-lot certificate. Free quote within 24 h, delivered in Dakhla City.
The creep coefficient, admissible deflections and loading age belong to structural design — not to the site.
Loading at 28 days instead of 7 markedly reduces deferred deformation when the schedule allows.
The same winning trio as for strength: W/C ≤ 0.50, prescribed dosage, 7-day curing — dense concrete creeps less.
Beams and slabs: creep adds its share over years — camber and templates account for it.
Deflection readings at key milestones: the gap against the announced calculation is the most precious follow-up data.

A concrete mix is designed to last 50 years, not to be redone: water/cement ratio, cover, curing and cement class — the levers that actually decide service life, especially on the coast.
Read article
CO₂ lowers the concrete's pH, depassivates the rebars and opens the door to corrosion. Phenolphthalein testing, accelerating factors and defence in depth.
Read article
Sea spray and marine air depassivate steel even in alkaline media: pitting corrosion. Critical threshold, transport and layered defence for the Dakhla coast.
Read articleOur team responds within 24h. CPJ 45 on request, CPJ 55 on request. Delivery within Dakhla included.