Delivery — Beni Mellal-Khenifra

Cement Delivery to Oued Zem

CPJ 45 and CPJ 55 cement delivery to Oued Zem, Beni Mellal-Khenifra. 120h lead time, 1470 km from Dakhla. Bulk, 50kg bags, 1T big bag. Free quote.

Lead Time

120h to Oued Zem

Distance

1470 km from Dakhla

Adapted Fleet

Tankers, flatbeds, big bag

Service Area

Oued Zem, Beni Mellal-Khenifra

Cement delivery to Oued Zem: key information

1470 km

Dakhla → Oued Zem distance

120h

Delivery lead time

3

Packaging modes

Bulk

Tanker truck 25-30T

Ideal for Oued Zem sites equipped with a silo. Discharge via pipe up to 30m. Most economical over long distance.

50kg bags

Flatbed pallet 1.5T

Manual handling, easy storage. Suited for small Oued Zem sites and split deliveries.

Big bag 1T

Crane truck

Compromise bulk/bags for Oued Zem. Crane handling, access to difficult sites. Sealed packaging.

Cement delivery to Oued Zem: logistics and organization

Dakhla Aménagement (DAM) delivers CPJ 45 and CPJ 55 cement to Oued Zem, in the Beni Mellal-Khenifra region. From our clinker grinding plant in Dakhla (capacity 500,000 T/year), we serve Oued Zem with a 120h lead time over a distance of about 1470 km. Our experienced drivers know the routes and access constraints to Oued Zem.

Three delivery modes are available in Oued Zem: bulk in tanker truck (25 to 30T, discharge via pipe up to 30m, ideal for sites equipped with a silo), 50kg bags on wrapped pallet (1.5T/pallet, manual handling, perfect for small sites) and the 1-ton big bag (crane handling, sealed packaging, access to difficult Oued Zem sites).

Orders confirmed before 12:00 are shipped the same day from Dakhla. For Oued Zem (1470 km), count on 120h to the site. The minimum quantity is 1 pallet (bags), 1 big bag or 10T in bulk. Grouped orders optimize transport cost on the Dakhla-Oued Zem distance.

DAM cement complies with NM 10.1.004 and EN 197-1, lab-tested before shipping. To arrange a delivery to Oued Zem, contact us at +212 658-265685 or request a free online quote: specify quantity, grade (CPJ 45/CPJ 55), packaging and delivery address.

FAQ — Cement delivery Oued Zem

What is the cement delivery delay to Oued Zem?

Delivery delay to Oued Zem (Beni Mellal-Khenifra) is 120h from our Dakhla grinding plant, 1470 km away. Orders confirmed before 12:00 are shipped the same day.

How does cement delivery to Oued Zem work?

For Oued Zem, we deliver via tanker truck (bulk 25-30T with discharge pipe), flatbed with 50kg bag pallets (1.5T/pallet), or big bag truck (1T/unit). The driver handles on-site unloading per your instructions.

What is the minimum order quantity for delivery to Oued Zem?

The minimum quantity is 1 pallet (1.5T bags) or 1 big bag (1T) for Oued Zem. For bulk, the minimum is 10T. Grouped orders benefit from optimized transport pricing on the Dakhla-Oued Zem distance (1470 km).

Is delivery to Oued Zem possible for sites in difficult areas?

Yes, we deliver to Oued Zem and its region (Beni Mellal-Khenifra) including sites in difficult areas. Specify accessibility (slope, terrain, restrictions) when requesting a quote: we adapt the truck and unloading method (crane big bag for sites inaccessible to tankers).

Besoin d'un devis ciment gratuit ?

Notre équipe vous répond sous 24h. CPJ 45 dès 1 500 DH/T, CPJ 55 dès 1 600 DH/T. Livraison Sud Maroc & Mauritanie.