Delivery — Tanger-Tetouan-Al Hoceima

Cement Delivery to Malabata

CPJ 45 and CPJ 55 cement delivery to Malabata, Tanger-Tetouan-Al Hoceima. 144h lead time, 1650 km from Dakhla. Bulk, 50kg bags, 1T big bag. Free quote.

Lead Time

144h to Malabata

Distance

1650 km from Dakhla

Adapted Fleet

Tankers, flatbeds, big bag

Service Area

Malabata, Tanger-Tetouan-Al Hoceima

Cement delivery to Malabata: key information

1650 km

Dakhla → Malabata distance

144h

Delivery lead time

3

Packaging modes

Bulk

Tanker truck 25-30T

Ideal for Malabata sites equipped with a silo. Discharge via pipe up to 30m. Most economical over long distance.

50kg bags

Flatbed pallet 1.5T

Manual handling, easy storage. Suited for small Malabata sites and split deliveries.

Big bag 1T

Crane truck

Compromise bulk/bags for Malabata. Crane handling, access to difficult sites. Sealed packaging.

Cement delivery to Malabata: logistics and organization

Dakhla Aménagement (DAM) delivers CPJ 45 and CPJ 55 cement to Malabata, in the Tanger-Tetouan-Al Hoceima region. From our clinker grinding plant in Dakhla (capacity 500,000 T/year), we serve Malabata with a 144h lead time over a distance of about 1650 km. Our experienced drivers know the routes and access constraints to Malabata.

Three delivery modes are available in Malabata: bulk in tanker truck (25 to 30T, discharge via pipe up to 30m, ideal for sites equipped with a silo), 50kg bags on wrapped pallet (1.5T/pallet, manual handling, perfect for small sites) and the 1-ton big bag (crane handling, sealed packaging, access to difficult Malabata sites).

Orders confirmed before 12:00 are shipped the same day from Dakhla. For Malabata (1650 km), count on 144h to the site. The minimum quantity is 1 pallet (bags), 1 big bag or 10T in bulk. Grouped orders optimize transport cost on the Dakhla-Malabata distance.

DAM cement complies with NM 10.1.004 and EN 197-1, lab-tested before shipping. To arrange a delivery to Malabata, contact us at +212 658-265685 or request a free online quote: specify quantity, grade (CPJ 45/CPJ 55), packaging and delivery address.

FAQ — Cement delivery Malabata

What is the cement delivery delay to Malabata?

Delivery delay to Malabata (Tanger-Tetouan-Al Hoceima) is 144h from our Dakhla grinding plant, 1650 km away. Orders confirmed before 12:00 are shipped the same day.

How does cement delivery to Malabata work?

For Malabata, we deliver via tanker truck (bulk 25-30T with discharge pipe), flatbed with 50kg bag pallets (1.5T/pallet), or big bag truck (1T/unit). The driver handles on-site unloading per your instructions.

What is the minimum order quantity for delivery to Malabata?

The minimum quantity is 1 pallet (1.5T bags) or 1 big bag (1T) for Malabata. For bulk, the minimum is 10T. Grouped orders benefit from optimized transport pricing on the Dakhla-Malabata distance (1650 km).

Is delivery to Malabata possible for sites in difficult areas?

Yes, we deliver to Malabata and its region (Tanger-Tetouan-Al Hoceima) including sites in difficult areas. Specify accessibility (slope, terrain, restrictions) when requesting a quote: we adapt the truck and unloading method (crane big bag for sites inaccessible to tankers).

Besoin d'un devis ciment gratuit ?

Notre équipe vous répond sous 24h. CPJ 45 dès 1 500 DH/T, CPJ 55 dès 1 600 DH/T. Livraison Sud Maroc & Mauritanie.