Delivery — Beni Mellal-Khenifra

Cement Delivery to Ouled Ayad

CPJ 45 and CPJ 55 cement delivery to Ouled Ayad, Beni Mellal-Khenifra. 120h lead time, 1500 km from Dakhla. Bulk, 50kg bags, 1T big bag. Free quote.

Lead Time

120h to Ouled Ayad

Distance

1500 km from Dakhla

Adapted Fleet

Tankers, flatbeds, big bag

Service Area

Ouled Ayad, Beni Mellal-Khenifra

Cement delivery to Ouled Ayad: key information

1500 km

Dakhla → Ouled Ayad distance

120h

Delivery lead time

3

Packaging modes

Bulk

Tanker truck 25-30T

Ideal for Ouled Ayad sites equipped with a silo. Discharge via pipe up to 30m. Most economical over long distance.

50kg bags

Flatbed pallet 1.5T

Manual handling, easy storage. Suited for small Ouled Ayad sites and split deliveries.

Big bag 1T

Crane truck

Compromise bulk/bags for Ouled Ayad. Crane handling, access to difficult sites. Sealed packaging.

Cement delivery to Ouled Ayad: logistics and organization

Dakhla Aménagement (DAM) delivers CPJ 45 and CPJ 55 cement to Ouled Ayad, in the Beni Mellal-Khenifra region. From our clinker grinding plant in Dakhla (capacity 500,000 T/year), we serve Ouled Ayad with a 120h lead time over a distance of about 1500 km. Our experienced drivers know the routes and access constraints to Ouled Ayad.

Three delivery modes are available in Ouled Ayad: bulk in tanker truck (25 to 30T, discharge via pipe up to 30m, ideal for sites equipped with a silo), 50kg bags on wrapped pallet (1.5T/pallet, manual handling, perfect for small sites) and the 1-ton big bag (crane handling, sealed packaging, access to difficult Ouled Ayad sites).

Orders confirmed before 12:00 are shipped the same day from Dakhla. For Ouled Ayad (1500 km), count on 120h to the site. The minimum quantity is 1 pallet (bags), 1 big bag or 10T in bulk. Grouped orders optimize transport cost on the Dakhla-Ouled Ayad distance.

DAM cement complies with NM 10.1.004 and EN 197-1, lab-tested before shipping. To arrange a delivery to Ouled Ayad, contact us at +212 658-265685 or request a free online quote: specify quantity, grade (CPJ 45/CPJ 55), packaging and delivery address.

FAQ — Cement delivery Ouled Ayad

What is the cement delivery delay to Ouled Ayad?

Delivery delay to Ouled Ayad (Beni Mellal-Khenifra) is 120h from our Dakhla grinding plant, 1500 km away. Orders confirmed before 12:00 are shipped the same day.

How does cement delivery to Ouled Ayad work?

For Ouled Ayad, we deliver via tanker truck (bulk 25-30T with discharge pipe), flatbed with 50kg bag pallets (1.5T/pallet), or big bag truck (1T/unit). The driver handles on-site unloading per your instructions.

What is the minimum order quantity for delivery to Ouled Ayad?

The minimum quantity is 1 pallet (1.5T bags) or 1 big bag (1T) for Ouled Ayad. For bulk, the minimum is 10T. Grouped orders benefit from optimized transport pricing on the Dakhla-Ouled Ayad distance (1500 km).

Is delivery to Ouled Ayad possible for sites in difficult areas?

Yes, we deliver to Ouled Ayad and its region (Beni Mellal-Khenifra) including sites in difficult areas. Specify accessibility (slope, terrain, restrictions) when requesting a quote: we adapt the truck and unloading method (crane big bag for sites inaccessible to tankers).

Besoin d'un devis ciment gratuit ?

Notre équipe vous répond sous 24h. CPJ 45 dès 1 500 DH/T, CPJ 55 dès 1 600 DH/T. Livraison Sud Maroc & Mauritanie.