Delivery — Guelmim-Oued Noun

Cement Delivery to Mirleft

CPJ 45 and CPJ 55 cement delivery to Mirleft, Guelmim-Oued Noun. 72h lead time, 860 km from Dakhla. Bulk, 50kg bags, 1T big bag. Free quote.

Lead Time

72h to Mirleft

Distance

860 km from Dakhla

Adapted Fleet

Tankers, flatbeds, big bag

Service Area

Mirleft, Guelmim-Oued Noun

Cement delivery to Mirleft: key information

860 km

Dakhla → Mirleft distance

72h

Delivery lead time

3

Packaging modes

Bulk

Tanker truck 25-30T

Ideal for Mirleft sites equipped with a silo. Discharge via pipe up to 30m. Most economical over long distance.

50kg bags

Flatbed pallet 1.5T

Manual handling, easy storage. Suited for small Mirleft sites and split deliveries.

Big bag 1T

Crane truck

Compromise bulk/bags for Mirleft. Crane handling, access to difficult sites. Sealed packaging.

Cement delivery to Mirleft: logistics and organization

Dakhla Aménagement (DAM) delivers CPJ 45 and CPJ 55 cement to Mirleft, in the Guelmim-Oued Noun region. From our clinker grinding plant in Dakhla (capacity 500,000 T/year), we serve Mirleft with a 72h lead time over a distance of about 860 km. Our experienced drivers know the routes and access constraints to Mirleft.

Three delivery modes are available in Mirleft: bulk in tanker truck (25 to 30T, discharge via pipe up to 30m, ideal for sites equipped with a silo), 50kg bags on wrapped pallet (1.5T/pallet, manual handling, perfect for small sites) and the 1-ton big bag (crane handling, sealed packaging, access to difficult Mirleft sites).

Orders confirmed before 12:00 are shipped the same day from Dakhla. For Mirleft (860 km), count on 72h to the site. The minimum quantity is 1 pallet (bags), 1 big bag or 10T in bulk. Grouped orders optimize transport cost on the Dakhla-Mirleft distance.

DAM cement complies with NM 10.1.004 and EN 197-1, lab-tested before shipping. To arrange a delivery to Mirleft, contact us at +212 658-265685 or request a free online quote: specify quantity, grade (CPJ 45/CPJ 55), packaging and delivery address.

FAQ — Cement delivery Mirleft

What is the cement delivery delay to Mirleft?

Delivery delay to Mirleft (Guelmim-Oued Noun) is 72h from our Dakhla grinding plant, 860 km away. Orders confirmed before 12:00 are shipped the same day.

How does cement delivery to Mirleft work?

For Mirleft, we deliver via tanker truck (bulk 25-30T with discharge pipe), flatbed with 50kg bag pallets (1.5T/pallet), or big bag truck (1T/unit). The driver handles on-site unloading per your instructions.

What is the minimum order quantity for delivery to Mirleft?

The minimum quantity is 1 pallet (1.5T bags) or 1 big bag (1T) for Mirleft. For bulk, the minimum is 10T. Grouped orders benefit from optimized transport pricing on the Dakhla-Mirleft distance (860 km).

Is delivery to Mirleft possible for sites in difficult areas?

Yes, we deliver to Mirleft and its region (Guelmim-Oued Noun) including sites in difficult areas. Specify accessibility (slope, terrain, restrictions) when requesting a quote: we adapt the truck and unloading method (crane big bag for sites inaccessible to tankers).

Besoin d'un devis ciment gratuit ?

Notre équipe vous répond sous 24h. CPJ 45 dès 1 500 DH/T, CPJ 55 dès 1 600 DH/T. Livraison Sud Maroc & Mauritanie.