Delivery — Souss-Massa

Cement Delivery to Ait Melloul

CPJ 45 and CPJ 55 cement delivery to Ait Melloul, Souss-Massa. 96h lead time, 1120 km from Dakhla. Bulk, 50kg bags, 1T big bag. Free quote.

Lead Time

96h to Ait Melloul

Distance

1120 km from Dakhla

Adapted Fleet

Tankers, flatbeds, big bag

Service Area

Ait Melloul, Souss-Massa

Cement delivery to Ait Melloul: key information

1120 km

Dakhla → Ait Melloul distance

96h

Delivery lead time

3

Packaging modes

Bulk

Tanker truck 25-30T

Ideal for Ait Melloul sites equipped with a silo. Discharge via pipe up to 30m. Most economical over long distance.

50kg bags

Flatbed pallet 1.5T

Manual handling, easy storage. Suited for small Ait Melloul sites and split deliveries.

Big bag 1T

Crane truck

Compromise bulk/bags for Ait Melloul. Crane handling, access to difficult sites. Sealed packaging.

Cement delivery to Ait Melloul: logistics and organization

Dakhla Aménagement (DAM) delivers CPJ 45 and CPJ 55 cement to Ait Melloul, in the Souss-Massa region. From our clinker grinding plant in Dakhla (capacity 500,000 T/year), we serve Ait Melloul with a 96h lead time over a distance of about 1120 km. Our experienced drivers know the routes and access constraints to Ait Melloul.

Three delivery modes are available in Ait Melloul: bulk in tanker truck (25 to 30T, discharge via pipe up to 30m, ideal for sites equipped with a silo), 50kg bags on wrapped pallet (1.5T/pallet, manual handling, perfect for small sites) and the 1-ton big bag (crane handling, sealed packaging, access to difficult Ait Melloul sites).

Orders confirmed before 12:00 are shipped the same day from Dakhla. For Ait Melloul (1120 km), count on 96h to the site. The minimum quantity is 1 pallet (bags), 1 big bag or 10T in bulk. Grouped orders optimize transport cost on the Dakhla-Ait Melloul distance.

DAM cement complies with NM 10.1.004 and EN 197-1, lab-tested before shipping. To arrange a delivery to Ait Melloul, contact us at +212 658-265685 or request a free online quote: specify quantity, grade (CPJ 45/CPJ 55), packaging and delivery address.

FAQ — Cement delivery Ait Melloul

What is the cement delivery delay to Ait Melloul?

Delivery delay to Ait Melloul (Souss-Massa) is 96h from our Dakhla grinding plant, 1120 km away. Orders confirmed before 12:00 are shipped the same day.

How does cement delivery to Ait Melloul work?

For Ait Melloul, we deliver via tanker truck (bulk 25-30T with discharge pipe), flatbed with 50kg bag pallets (1.5T/pallet), or big bag truck (1T/unit). The driver handles on-site unloading per your instructions.

What is the minimum order quantity for delivery to Ait Melloul?

The minimum quantity is 1 pallet (1.5T bags) or 1 big bag (1T) for Ait Melloul. For bulk, the minimum is 10T. Grouped orders benefit from optimized transport pricing on the Dakhla-Ait Melloul distance (1120 km).

Is delivery to Ait Melloul possible for sites in difficult areas?

Yes, we deliver to Ait Melloul and its region (Souss-Massa) including sites in difficult areas. Specify accessibility (slope, terrain, restrictions) when requesting a quote: we adapt the truck and unloading method (crane big bag for sites inaccessible to tankers).

Besoin d'un devis ciment gratuit ?

Notre équipe vous répond sous 24h. CPJ 45 dès 1 500 DH/T, CPJ 55 dès 1 600 DH/T. Livraison Sud Maroc & Mauritanie.